Skip to main content

Projects

PNRR Projects

21 November 2023 | Projects

NRRP, Next Generation EU Projects

  • Next generation eu
    Next generation eu
  • Ministero Università e Ricerca
    Ministero Università e Ricerca
  • Italia Domani - Piano Nazionale di Ripresa e Resilienza
    Italia Domani - Piano Nazionale di Ripresa e Resilienza

Map of the GARR-T network outlining the interventions planned by the PNRR projects

Mappa della rete GARR-T con gli interventi dei progetti PNRR
(function(){const e=document.createElement("link").relList;if(e&&e.supports&&e.supports("modulepreload"))return;for(const i of document.querySelectorAll('link[rel="modulepreload"]'))r(i);new MutationObserver(i=>{for(const o of i)if(o.type==="childList")for(const l of o.addedNodes)l.tagName==="LINK"&&l.rel==="modulepreload"&&r(l)}).observe(document,{childList:!0,subtree:!0});function t(i){const o={};return i.integrity&&(o.integrity=i.integrity),i.referrerPolicy&&(o.referrerPolicy=i.referrerPolicy),i.crossOrigin==="use-credentials"?o.credentials="include":i.crossOrigin==="anonymous"?o.credentials="omit":o.credentials="same-origin",o}function r(i){if(i.ep)return;i.ep=!0;const o=t(i);fetch(i.href,o)}})();var B,f,fe,P,J,ae,z,C={},de=[],Se=/acit|ex(?:s|g|n|p|$)|rph|grid|ows|mnc|ntw|ine[ch]|zoo|^ord|itera/i,X=Array.isArray;function H(_,e){for(var t in e)_[t]=e[t];return _}function pe(_){var e=_.parentNode;e&&e.removeChild(_)}function $e(_,e,t){var r,i,o,l={};for(o in e)o=="key"?r=e[o]:o=="ref"?i=e[o]:l[o]=e[o];if(arguments.length>2&&(l.children=arguments.length>3?B.call(arguments,2):t),typeof _=="function"&&_.defaultProps!=null)for(o in _.defaultProps)l[o]===void 0&&(l[o]=_.defaultProps[o]);return U(_,l,r,i,null)}function U(_,e,t,r,i){var o={type:_,props:e,key:t,ref:r,__k:null,__:null,__b:0,__e:null,__d:void 0,__c:null,__h:null,constructor:void 0,__v:i??++fe};return i==null&&f.vnode!=null&&f.vnode(o),o}function q(_){return _.children}function D(_,e){this.props=_,this.context=e}function T(_,e){if(e==null)return _.__?T(_.__,_.__.__k.indexOf(_)+1):null;for(var t;ev?$>x-v?k+=g-v:k--:k=g=0||s=0){if((u=e[l])&&i==u.key&&o===u.type)return l;l--}if(s

Projects archive

16 March 2017 | Projects

$(document).ready(function() { $('#prog-arch').DataTable( { order: [[2,'desc']], scrollY: '500px', scrollX: true, scrollCollapse: true, paging: false } ); } );

Consortium Garr is active at national and international level and participates in different ways for projects and collaborations.

Below is a list of all projects that have seen GARR involved.

  Ongoing projects

Far scorrere la tabella in modalità mobile

ProjectStartEndDurationFunded by daProgramGARR RoleLinkSheet GN5-1 2023-01-01 2024-12-31 24 CE Horizon Europe partner MindBot 2020-01-01 2022-12-31 36 CE H2020 terza parte CLONETS DS 2020-10-01 2022-09-30 24 CE H2020 terza parte NEANIAS 2019-11-01 2022-10-31 36 CE H2020 partner EOSC-Pillar 2019-07-01 2022-06-30 36 CE H2020 coordinatore GÉANT-GN4-3 2019-01-01 2023-12-31 60 CE H2020 partner GÉANT-GN4-3N 2019-01-01 2022-12-31 48 CE H2020 partner OCRE 2019-01-01 2021-12-31 36 CE H2020 referrer Swing Project 2018-09-01 2021-12-31 40 CE Erasmus+ coordinatore Europe in C 2018-09-01 2020-04-30 20 CE Erasmus+ partner AARC 2 2017-05-01 2019-04-30 24 CE H2020 partner Up2U 2017-01-01 2019-12-31 36 CE H2020 partner CLONETS 2017-01-01 2019-06-30 30 CE H2020 terza parte EOSCpilot 2017-01-01 2018-12-31 24 CE H2020 terza parte BELLA-T1 2016-08-17 2021-12-31 64,5 CE EUROPEAID subcontractor BELLA-S1 2016-05-01 2021-12-31 68 CE H2020 partner GÉANT-GN4-2 2016-05-01 2018-12-31 32 CE H2020 partner EaPConnect 2015-07-01 2025-06-30 120 CE DG NEAR - EU4Digital initiative Associate partner GÉANT-GN4-1 2015-05-01 2016-04-30 12 CE H2020 partner AARC 2015-05-01 2017-04-30 24 CE H2020 partner INNI 2015-01-01 2016-11-24   Fondazione Italiana Sclerosi Multipla   subcontractor La società della Conoscenza 2014-01-01 2015-06-30 28 Regione Abruzzo POR FSE 2007-2013 subcontractor GARR-X Progress 2013-07-01 2016-03-31 33 MIUR PON Avv. D.D. 274 del 202013-02-15 proponente GÉANT-GN3PLUS 2013-04-01 2015-04-13 22 CE FP7 partner COLIBRI' 2013-02-18 2017-02-18 48 Ministero della Salute Ricerca Finalizzata 2010 partner GRIDCORE 2013-02-01 2016-12-31 34 Ministero della Salute Ricerca Finalizzata 2010 partner CHAIN-REDS 2012-12-01 2015-05-31 30 CE FP7 partner DCH-RP 2012-10-01 2014-09-31 24 CE FP7 partner ELCIRA 2012-06-01 2014-10-31 24 CE FP7 partner EUMEDCONNECT3 2011-09-01 2021-12-31 124   ENPI SOUTH coordinatore OrientPlus 2011-07-01 2014-12-31 42 CE FP7 partner AFRICA CONNECT 2011-05-06 2015-04-30 48 CE EUROPEAID terza parte ELLA 2011-05-02 2012-07-31 15 CE FP7 coordinatore CHAIN 2010-12-01 2012-12-31 24 CE FP7 partner DECIDE 2010-09-01 2013-02-28 24+6 CE FP7 coordinatore NOVI 2010-09-01 2013-02-28 30 CE FP7 partner INDICATE 2010-09-01 2012-08-31 24 CE FP7 partner FIRESTATION 2010-06-01 2013-05-31 36 CE FP7 partner EGI-InSPIRE 2010-05-01 2014-04-30 48 CE FP7 partner EUIndiaGrid2 2010-01-01 2011-12-31 24 CE FP7 partner EUMEDGRID-Support 2010-01-01 2011-12-31 24 CE FP7 partner GÉANT-GN3 2009-04-01 2013-03-31 48 CE FP7 partner Alice 2 2009-04-01 2012-12-01 45 CE EUROPEAID partner Gran Sasso in Rete 2009-04-01 2010-12-31 21 Regione Abruzzo P.O. FSE Abruzzo 2009-2010-2011 Ob. CRO subcontractor EVALSO 2008-01-01 2011-06-30 42 CE FP7 partner FEDERICA 2008-01-01 2010-10-31 30+4 CE FP7 coordinatore EUMEDCONNECT2 2007-12-01 2010-12-01 36 CE EUROPEAID partner EU-IndiaGrid 2006-10-01 2009-01-31 28 CE FP6 partner EGEE II 2006-04-01 2008-04-30 25 CE FP6 partner EUChinaGrid 2006-01-01 2008-03-31 27 CE FP6 partner EUMEDGRID 2006-01-01 2008-02-29 26 CE FP6 partner AUGERACCESS 2005-11-01 2011-10-31 72 CE FP6 partner ORIENT 2005-10-01 2010-12-31 63 CE FP6 partner GÉANT-GN2 2004-09-01 2009-03-31 55 CE FP6 partner MUPBED 2004-07-01 2007-09-30 39 CE FP6 partner EGEE 2004-04-01 2006-03-31 24 CE FP6 partner ALICE 2003-12-01 2008-03-31 52 CE EUROPEAID partner 6NET 2002-10-01 2005-06-30 42 CE FP5 partner EUMEDCONNECT 2001-12-01 2004-11-30 36 CE EUROPEAID partner GÉANT-GN1 2000-09-01 2004-08-30 48 CE FP5 partner
torna su